Sailing Yabávideo

Countdown to Christmas: 17 Days of Boat Jobs — Sailing Yabá 248

December 17, 2024 · 12 min · 40K views

What this video covers

Ben and MP continue a series of refit projects on Yabá while docked at a marina.0:24 The crew installs new grids above the seating area to improve storage space and mounts a frame around the 24-volt electrical panel.10:57 To mitigate rust caused by saltwater deck washdowns and wave spray, they install six meters of PVC piping and elbow joints to redirect water drainage directly into the bilge.8:42 The crew also prepares for a major davit system installation, coordinating with local welders who arrived to take final measurements for the fabrication.11:08 Additionally, the arrival of specific stone materials allows for the completion of interior finish work in the head and living areas before the holidays.4:11 The crew plans to use the new davit system to hoist the dinghy once the welding work concludes.11:13

Watch on YouTube

More from Sailing Yabá

Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáSep 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing YabáSep 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing YabáAug 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing YabáAug 2026

From Sailing Yabá — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue