Sailing Yabávidéo

Countdown to Christmas: 17 Days of Boat Jobs — Sailing Yabá 248

17 décembre 2024 · 12 min · 40K vues

Ce que couvre cette vidéo

Ben and MP continue a series of refit projects on Yabá while docked at a marina.0:24 The crew installs new grids above the seating area to improve storage space and mounts a frame around the 24-volt electrical panel.10:57 To mitigate rust caused by saltwater deck washdowns and wave spray, they install six meters of PVC piping and elbow joints to redirect water drainage directly into the bilge.8:42 The crew also prepares for a major davit system installation, coordinating with local welders who arrived to take final measurements for the fabrication.11:08 Additionally, the arrival of specific stone materials allows for the completion of interior finish work in the head and living areas before the holidays.4:11 The crew plans to use the new davit system to hoist the dinghy once the welding work concludes.11:13

Regarder sur YouTube

Plus de vidéos de Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásept. 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásept. 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabásept. 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáaoût 2026

De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème