Sailing Yabávidéo
Countdown to Christmas: 17 Days of Boat Jobs — Sailing Yabá 248
17 décembre 2024 · 12 min · 40K vues
Ce que couvre cette vidéo
Ben and MP continue a series of refit projects on Yabá while docked at a marina.0:24 The crew installs new grids above the seating area to improve storage space and mounts a frame around the 24-volt electrical panel.10:57 To mitigate rust caused by saltwater deck washdowns and wave spray, they install six meters of PVC piping and elbow joints to redirect water drainage directly into the bilge.8:42 The crew also prepares for a major davit system installation, coordinating with local welders who arrived to take final measurements for the fabrication.11:08 Additionally, the arrival of specific stone materials allows for the completion of interior finish work in the head and living areas before the holidays.4:11 The crew plans to use the new davit system to hoist the dinghy once the welding work concludes.11:13
Plus de vidéos de Sailing Yabá
De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



