Sailing Yabávideo

Countdown to Christmas: 17 Days of Boat Jobs — Sailing Yabá 248

17 dicembre 2024 · 12 min · 40K visualizzazioni

Cosa tratta questo video

Ben and MP continue a series of refit projects on Yabá while docked at a marina.0:24 The crew installs new grids above the seating area to improve storage space and mounts a frame around the 24-volt electrical panel.10:57 To mitigate rust caused by saltwater deck washdowns and wave spray, they install six meters of PVC piping and elbow joints to redirect water drainage directly into the bilge.8:42 The crew also prepares for a major davit system installation, coordinating with local welders who arrived to take final measurements for the fabrication.11:08 Additionally, the arrival of specific stone materials allows for the completion of interior finish work in the head and living areas before the holidays.4:11 The crew plans to use the new davit system to hoist the dinghy once the welding work concludes.11:13

Guarda su YouTube

Altro da Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabáset 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabáset 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabáset 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáago 2026

Da Sailing Yabá — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema