Sailing Yabávideo

Countdown to Christmas: 17 Days of Boat Jobs — Sailing Yabá 248

17. desember 2024 · 12 min · 40K visninger

Hva denne videoen dekker

Ben and MP continue a series of refit projects on Yabá while docked at a marina.0:24 The crew installs new grids above the seating area to improve storage space and mounts a frame around the 24-volt electrical panel.10:57 To mitigate rust caused by saltwater deck washdowns and wave spray, they install six meters of PVC piping and elbow joints to redirect water drainage directly into the bilge.8:42 The crew also prepares for a major davit system installation, coordinating with local welders who arrived to take final measurements for the fabrication.11:08 Additionally, the arrival of specific stone materials allows for the completion of interior finish work in the head and living areas before the holidays.4:11 The crew plans to use the new davit system to hoist the dinghy once the welding work concludes.11:13

Se på YouTube

Mer fra Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep. 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep. 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabásep. 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáaug. 2026

Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem