Sailing Squibvideo
Sailing - Squib - Refit - Countdown to the last days
14 August 2025 · 24 min · 1K views
What this video covers
The crew of the vessel Squib completes final refit tasks over four days in August to prepare for departure.0:23 Initial engine testing reveals a fuel delivery failure caused by air in the lines, which the crew resolves by clearing the fuel hose with a compressor.5:24 Persistent leaks in the engine’s oil line are addressed using aluminum gaskets and thread-locking sealant.16:07 The crew services two salvaged genoa winches, replacing a missing spring with a repair kit sourced from a local marine supplier, Maritimo.19:28 Additional work includes installing a new water pump, connecting freshwater tanks, and finalizing the installation of a marine toilet.15:51 Sabina fabricates a custom mosquito net enclosure for the cockpit.15:31 Despite ongoing minor leaks and mechanical adjustments, the crew confirms a departure time for a 40-kilometer transit down the Danube, planning to pass through the Freudenau lock and moor at a local dock.23:21 The refit process demonstrates that persistent mechanical issues, such as air-locked fuel lines or leaking fittings, often require iterative testing and specialized hardware to resolve before a vessel is seaworthy.
More from Sailing Squib
From Sailing Squib — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



