Project Brupegvideo

Final Prep & Leaving our home port for good - Project Brupeg Ep. 381

17 November 2024 · 47 min · 34K views · Gladstone

What this video covers

The crew of the 10-year refit project *Brewpeg* prepares for a maiden sea trial and coastal passage to Gladstone, Australia.Watch Final maintenance tasks include installing a turbine-style fuel flow meter, replacing split hydraulic fittings on the gearbox pressure sensor, and securing galley benches and drawer locks.1:00 The team also performs a remote software update on the Victron power system to address persistent shore power breaker trips, though the issue remains unresolved.0:09 To prepare for the transit, the crew calibrates the autopilot, aligns the radar, and conducts a short two-hour sea trial to test boat performance and stabilizer wing deployment in calm conditions.20:34 The vessel is scheduled for a 13-hour passage, timed to arrive in daylight.20:21 Practical takeaways include using iodine to mark drawer-lock positions for precise mounting and the necessity of using steel rather than lower-rated adapters for high-pressure hydraulic gearbox sensors.18:53

Watch on YouTube

More from Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463Oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462Sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461Sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460Sept 2026

From Project Brupeg — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue