Sailing Yabávideo
Boat rebuild: cutting and laying down our interior purpleheart WOODEN FLOOR — Sailing Yabá #112
18 December 2022 · 26 min · 133K views
What this video covers
The crew of Yabá is installing a purpleheart wood floor and interior bulkheads as part of a comprehensive boat rebuild.0:36 To manage electrical wiring and socket access, the team designed the interior bulkheads in two sections, leaving a horizontal gap in the middle for a removable plywood panel.1:57 They are using 15-centimeter-wide plywood strips to frame these wall divisions and provide a sturdy mounting surface for future electrical runs.2:20 The flooring installation requires precise template-making with a jigsaw to fit around complex engine room contours and cabin divisions.8:00 For the finish, the crew selected a thick, outdoor-grade domestic deck varnish rather than polyurethane, noting that the chosen product avoids an overly reddish tint and maintains a matte appearance on the purpleheart.12:07 Simultaneously, the team is fiberglassing the roof using small, torn pieces of mat to better conform to curved edges, a technique they found more effective than applying large sheets.22:18
More from Sailing Yabá
From Sailing Yabá — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



