Sailing Yabávideo

Boat rebuild: cutting and laying down our interior purpleheart WOODEN FLOOR — Sailing Yabá #112

18 December 2022 · 26 min · 133K views

What this video covers

The crew of Yabá is installing a purpleheart wood floor and interior bulkheads as part of a comprehensive boat rebuild.0:36 To manage electrical wiring and socket access, the team designed the interior bulkheads in two sections, leaving a horizontal gap in the middle for a removable plywood panel.1:57 They are using 15-centimeter-wide plywood strips to frame these wall divisions and provide a sturdy mounting surface for future electrical runs.2:20 The flooring installation requires precise template-making with a jigsaw to fit around complex engine room contours and cabin divisions.8:00 For the finish, the crew selected a thick, outdoor-grade domestic deck varnish rather than polyurethane, noting that the chosen product avoids an overly reddish tint and maintains a matte appearance on the purpleheart.12:07 Simultaneously, the team is fiberglassing the roof using small, torn pieces of mat to better conform to curved edges, a technique they found more effective than applying large sheets.22:18

Watch on YouTube

More from Sailing Yabá

Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing YabáAug 2026This Anchorage Was Worth Every Miserable Mile — Sailing YabáAug 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing YabáAug 2026Sailing Through the World's Largest Atlantic Rainforest! — Sailing YabáJul 2026

From Sailing Yabá — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue