MJ Sailingvideo

We Get an Inspection From the Factory (MJ Sailing - Ep 307)

28 October 2023 · 19 min · 64K views

What this video covers

Matt and Jessica install stainless steel ball valves in the bilge of their Max Cruise catamaran to equalise the water levels between two 80-gallon tanks.1:43 Because the valves sit in a tight, inaccessible area near the anchor chain locker, Matt uses a through-hull wrench to tighten the fittings after sealing them with NSF-rated Sikaflex 291.6:37 To prevent the anchor chain from damaging the valves, the pair plans to construct a protective fibreglass bulkhead around the installation.10:08 During the Annapolis Boat Show, the couple hosts Terry, a representative from the Max Cruise factory, who inspects their ongoing build and confirms the structural integrity of their bonded bulkheads and fibreglass work.12:57 The visit coincides with the arrival of Hull 4 of the Max Cruise model, which allows the owners to compare their progress against a finished vessel.13:48 The project demonstrates the necessity of protecting critical plumbing components from heavy, moving gear like anchor chain.

Watch on YouTube

More from MJ Sailing

Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)Jul 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)Jun 2026Preparing Our Catamaran for Paint—and Me for Captain's SchoolJun 2026The Bad News: We Have To Cut This Bulkhead Out (MJ Sailing - Episode 377)May 2026

From MJ Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue