Project Brupegvideo

Chockfast: a hard road to success - Brupeg Ep.330

19 November 2023 · 58 min · 60K views

What this video covers

Damien and the crew of the fishing trawler Brupeg rebuild the vessel’s engine mounts using Chockfast, a high-strength, cement-based epoxy. After a failed initial pour, the team removes the hardened material using a hammer and cold chisel, noting that standard power tool blades melt upon contact with the substance.1:34 To ensure a precise engine alignment, they use a dial gauge and feeler gauges to achieve a tolerance of 10 microns.11:14 The team constructs custom molds for the new mounts using core flute and seals them with silicone, applying the sealant into tight gaps with a welding filler rod.10:10 Because Chockfast has a lower surface tension than water, they perform a food-coloring water test to verify the integrity of the molds before pouring.33:19 To avoid drilling through the cured epoxy later, they insert silicone-coated bolts into the molds to create clean mounting holes.25:47 The process concludes with a final alignment check and the use of a flapper disc to smooth the cured mounts.39:42

Watch on YouTube

More from Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463Oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462Sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461Sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460Sept 2026

From Project Brupeg — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue