Sailing Yabávideo
Hoist the Nets! Transforming our rescued SHIP into a Pirate's Dream! — Sailing Yabá 197
10 March 2024 · 22 min · 120K views
What this video covers
The crew of Yabá continues the refit of their vessel, focusing on installing bow netting and finalizing engine systems. To secure the bowsprit netting, the team installs stainless steel rings and whisker stays, initially using rope before deciding to transition to hooks for a more permanent, cleaner attachment.1:44 They secure a sliding ring on the bowsprit with Sikaflex to prevent movement under tension.5:07 Engine preparations reach near-completion with the installation of a waterproof IP68-rated gel box for pump connectors and the routing of the diesel return line to the fuel tank.7:39 Additionally, the crew prepares to strip old paint from the boom, discovering an abandoned bird's nest inside the spar before applying chemical paint stripper.21:19 While large solar panels have arrived for the roof, the crew decides to delay their installation until after the boom is refinished to avoid potential damage during the lifting process.16:53
More from Sailing Yabá
From Sailing Yabá — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



