Catamaran Mistertong video

#40 Small jobs resume on our catamaran Mistertong

28 September 2024 · 40 min · 4K views

What this video covers

Djé and the crew of the catamaran Mistertong perform various maintenance tasks while anchored in the Caribbean. The captain focuses on repairing stanchion bases to prevent water ingress into the wooden deck structure.2:18 He uses a DIY technique to create custom inserts, wrapping fibreglass-reinforced mastic around 20mm rod stock to compensate for the 22mm internal diameter of the stainless steel stanchions.3:50 Teflon washers are installed between the deck and the stanchion bases to protect the surface.4:54 Additionally, the crew upgrades the boat's electrical system by replacing an undersized 450-watt inverter with a 2000 VA unit, wired with 70mm² cable to the 12-volt battery bank.32:06 They also install a new 100-amp battery charger to replace an existing 30-amp unit.33:51 The work includes sanding and fairing various deck areas, with plans to improve the sealing of cockpit lockers in the future. The crew balances these repairs with social activities and local exploration. Using a makeshift mould with cellophane allows for precise shaping of the epoxy-based filler used for the stanchion inserts.16:01

Watch on YouTube

More from Catamaran Mistertong

#258 Between interviews, small jobs, and paperwork...Sept 2026#257 When things don't go as expected....Sept 2026#255 Between portholes and delicacies ...Sept 2026#254 Sailing trip, reunion, back to work and beauty ....Sept 2026

From Catamaran Mistertong — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue