Sailing With Phoenix | Olivervideo

The Install. 25 days until I cross the Pacific Ocean.

6 April 2025 · 21 min · 7K views · Oregon

What this video covers

After 12 days of fiberglass repairs and gel coat application to the anchor locker, the owner of With Phoenix | Oliver installs a new Lewmar windlass.1:14 The installation requires significant physical effort to seat the heavy unit into the deck, requiring precise alignment within a tight space.9:03 Following the mechanical mounting, the project involves custom-crimping electrical wiring to connect the motor to the boat's power system.13:57 The owner repurposes existing holes for a new negative terminal post to accommodate the wiring configuration.16:33 Despite the successful operation of the windlass, the wiring remains unorganized, and the owner plans to finalize the electrical cleanup and test the fit of 150 feet of chain and 150 feet of rode in subsequent sessions.18:34 Shortly after completing the installation, a neighboring vessel collided with the hull, causing cosmetic damage.20:21 The project demonstrates that replacing a windlass often involves extensive deck reconstruction and custom electrical work beyond the initial mechanical swap.

Watch on YouTube

More from Sailing With Phoenix | Oliver

38 days until I sail around the world without stopping Aug 2026First Sail Alone Since Sailing To Hawai'iAug 202664 Days Until I Sail Nonstop Around The WorldJul 2026I've been doing a bad job...May 2026

From Sailing With Phoenix | Oliver — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue