Expedition Evansvideo

SALVAGE SAILBOAT - Getting our Project Boat to a DIY Marina! | Expedition Evans 4

4 September 2020 · 17 min · 284K views

What this video covers

Brett and Jade Evans relocate their project sailboat from a marina to a boatyard for structural repairs, including a planned keel drop. During the transit, the crew monitors the engine and autopilot while navigating shallow, six-foot depths and avoiding crab pot buoys.1:48 Upon arrival, a yard manager assists with backing the vessel into a slip before a travel lift hauls the boat out of the water.7:50 Inspection of the internal grid reveals that the hull-to-grid gap closed once the keel weight was supported by the slings, confirming the grid is settling correctly.9:20 The crew uses a breaker bar and a cheater bar to successfully break loose the stubborn keel bolts from inside the cabin, preparing the structure for removal.14:30 They also utilize a custom-made rescue harness to safely transport their dogs onto the boat while it sits in the yard.12:02 The successful loosening of the keel bolts confirms that the primary structural disassembly can proceed as scheduled.

Watch on YouTube

More from Expedition Evans

What It's Really Like Anchored Off a UNINHABITED Island | EE 176May 2026Why Everyone is QUITTING Sailing | EE 175May 2026We Are No Different Than Any Other Sailor (we might be WORSE) | EE 174Mar 2026HOW WE EAT? (first we have to catch it) | EE 173Mar 2026

From Expedition Evans — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue