Breaking Wavesvideo
Sailors in Mexico Prep for Pacific Crossing: Stack Pack DIY and Electronics OVERHAUL
4 February 2024 · 17 min · 28K views · Barra de Navidad
What this video covers
A couple preparing for a Pacific crossing in Barra de Navidad, Mexico, completes three major refit projects: repairing a windlass, installing a Hydrovane, and sewing a custom stack pack. The windlass, which had become unresponsive, required only cleaning of the electrical contacts rather than replacement parts.1:50 To install the Hydrovane, the crew relocated the outboard motor crane and mount from the port side to the starboard side to clear obstructions caused by the propane locker.7:01 The custom stack pack project involved measuring, cutting, and sewing fabric over two weeks, requiring multiple restarts and assistance from a fellow cruiser for sewing supplies.16:53 Additionally, the crew troubleshoots a failing Raymarine AIS 700 system by testing the NMEA 2000 backbone resistance.12:10 After identifying and replacing a faulty 120-ohm terminator, the AIS transceiver reappeared on the network, though configuration issues persisted.13:56
More from Breaking Waves
From Breaking Waves — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



