Sailing Zataravideo
WE INSTALLED WATER LINES all by ourselves! (big mistake?) Ep 333
14 August 2025 · 17 min · 120K views
What this video covers
Keith and Jack Whitaker install a new water line system on their Montana property to support a planned 80-by-80-foot barn.▶ 1:05 The project involves trenching through shale using a rented mini excavator, which averages 50 feet of progress per hour.▶ 4:42 After a mechanical failure halts the initial rental, the crew secures a replacement to complete the excavation.▶ 5:39 They run the line from an existing well, installing multiple hydrants around a greenhouse and the future barn site.▶ 13:20 To prevent freeze damage, the crew buries the pipe at a depth of six feet, cushioning it with a layer of fine sand before backfilling with gravel and native soil.▶ 15:21 The installation includes tapping into the existing well line and adding valve access for future irrigation and plumbing.▶ 7:55 The project serves as site preparation for upcoming concrete foundation work and radiant floor installation.▶ 14:08
More from Sailing Zatara
From Sailing Zatara — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



