Sailing Yabávideo

Sail rigging upgrade: faster, safer and with more fun — Sailing Yabá 219

25 August 2024 · 21 min · 86K views · Brazil

What this video covers

The crew of Yabá upgrades the vessel’s running rigging and interior systems to improve safety, speed, and organization. They replace existing mainsheet pulleys with a heavy-duty system using soft shackles, opting for temporary anchor points until they can test the configuration in heavier winds and install a permanent traveler.3:28 To improve interior storage and climate control, they relocate a fridge-freezer unit next to the existing fridge and install a four-inch day-night solar vent in the bow locker to mitigate humidity.10:02 The project also includes installing custom purple heart handrails on the deck to provide secure tie-down points for gear and replacing a plastic furling cleat with a sturdier metal version to better manage sail reefing in high winds.17:12 Future plans involve installing individual two-inch diesel fillers for each of the four fuel tanks to accommodate high-flow fuel station hoses.13:18 Testing the new freezer and ventilation systems confirms the effectiveness of the current installation methods.7:39

Watch on YouTube

More from Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing YabáSept 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáSept 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing YabáSept 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing YabáAug 2026

From Sailing Yabá — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue