Sailing Squibvideo

Squib's Refit - Installing Deck Fittings - Galley Work - Installing Pulpit /96

5 December 2024 · 20 min · 817 views

What this video covers

The refit of the vessel Squib focuses on installing deck hardware, modifying interior cabinetry, and relocating through-hull fittings. The owner installs a wind vane steering console by replacing short mounting bolts with longer ones and sealing the hardware with butyl tape to ensure a watertight fit.1:27 To accommodate the console, the owner planes down a wooden reinforcement block to allow the self-locking nuts to seat properly on the bolts.8:36 The crew also installs stanchion bases for the bow pulpit, using butyl tape around the bolt heads and washers to prevent leaks into the interior storage lockers.19:06

Interior work includes modifying a galley drawer that warped during installation, requiring the owner to sand the edges to ensure smooth operation.9:44 The crew also determines the new location for a seawater intake through-hull fitting, selecting a position that allows for tool access while avoiding interference with planned interior shelving.11:04 The galley block is removed for off-site sanding and painting.19:43 The project remains on schedule for completion by the following May.0:56

Watch on YouTube

More from Sailing Squib

Sailing Squib - May 2026/3Sept 2026Sailing Squib May 2026 /2Aug 2026Sailing Squib - Contemporary WitnessJul 2026Sailing Squib - May 2026 /1Jul 2026

From Sailing Squib — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue