Sailing Yacht Zoravideo

Varnish Time And Heads - Episode 42 - Sailing Yacht Zora

1 April 2020 · 23 min · 11K views

What this video covers

Refitting the head compartment on Yacht Zora involves installing a salvaged holding tank behind the engine room, constructing a wet room shower, and framing new bulkheads.0:44 The holding tank sits on a custom bracket, with rubber vibration dampening planned between the steel and stainless steel components.2:44 The layout includes a shower tray with a sump pump, an access hatch for plumbing and water heater maintenance, and plywood paneling that will eventually be fiberglassed.1:55 To ensure a precise fit for the fiberglass work, templates are created from 6mm plywood, with panels trimmed to match the overhead and bulkhead geometry.5:04 Due to cold weather and high winds, interior fiberglassing is paused in favor of finishing galley doors and drawers.11:26 These Iroko components are sanded with 100-grit paper, cleaned with methylated spirits, and treated with a two-step Owatrol D1 saturating oil and D2 varnish process.12:01

Watch on YouTube

More from Sailing Yacht Zora

Dodging Ice in GreenlandJan 2025Sailing Newfoundland to GreenlandDec 2024Sailing down the West Coast of Spain - Episode 62 - Sailing Yacht ZoraNov 2021The Boat WENT UP IN FLAMES .....AGAIN -Episode 58-Sailing Yacht ZoraAug 2021

From Sailing Yacht Zora — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue