C&C Landfall 43 We're getting somewhere! [E265]
20 October 2023 · 10 min · 1K views · Penetanguishene
What this video covers
Alex and Cory perform maintenance on their C&C Landfall 43 while docked at a marina undergoing renovations. The project focuses on identifying the status of all through-hull fittings, three of which are seized.0:09 Inspection of the deck reveals soft spots in the lazarette core caused by waterlogged wood, which requires future repair.0:16 The crew organizes and reinstalls stanchions and lifelines to improve deck safety, a task complicated by mismatched hole sizes in the aluminum stanchion bases.3:57 Cory uses a borrowed bench vise to remove three stubborn stainless steel bolts that resisted drilling and punching.6:12 The lack of running water at the marina necessitates using the boat for bathing.8:04 The crew also takes measurements for upcoming projects before departing the vessel.10:40
More from Wildly Intrepid Sailing
From Wildly Intrepid Sailing — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



