Expedition Evansvideo

We (finally) Step Our MAST! | Expedition Evans 37

30 April 2021 · 20 min · 165K views

What this video covers

After four months of repairs, the owners of the sailboat *eva* successfully step their mast at a rigging yard.Watch The process requires navigating a narrow channel at mid-tide to reach the yard’s pit.6:17 During the transit, the engine fails to start due to a loose, multi-wire electrical plug, which the owner temporarily repairs by manually compressing the connection.7:35 Once at the yard, riggers attach the standing rigging and tension the mast, which measures 59 feet from the deck.8:58 The height confirms the vessel cannot clear most Intracoastal Waterway (ICW) bridges.9:00 Following the installation, the crew notes the boat is significantly more susceptible to wind while motoring.13:11 The engine’s coolant-based hot water heater functions, though it fails to reach full temperature during the short, cold-weather transit.16:42 The project concludes with the mast secured and the vessel once again rigged for sailing.

Watch on YouTube

More from Expedition Evans

What It's Really Like Anchored Off a UNINHABITED Island | EE 176May 2026Why Everyone is QUITTING Sailing | EE 175May 2026We Are No Different Than Any Other Sailor (we might be WORSE) | EE 174Mar 2026HOW WE EAT? (first we have to catch it) | EE 173Mar 2026

From Expedition Evans — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue