RAN Sailingvideo

Stairway To Fiberglass Heaven- Ep. 366 RAN Sailing

6 October 2023 · 21 min · 130K views · Skåne län

What this video covers

Johan and Malin prepare their barn workshop for the hull lamination of their custom boat build by cleaning a 150-square-meter hayloft to serve as a fiberglass cutting station.0:57 To improve access to this loft, Johan constructs a narrow, space-saving staircase to replace a ladder, allowing for easier transport of materials.16:01 The hull preparation involves filling screw holes and gaps with thickened epoxy, followed by a light sanding to create a smooth surface for the upcoming lamination.7:39 The team selected E-glass for the hull construction, opting for four layers of 600-gram biaxial cloth on the exterior and a 150-gram twill weave top layer to minimize print-through and provide a sanding guide.9:18 They rejected carbon fiber, basalt, and S-glass due to significantly higher costs and increased complexity in hand-layup saturation.11:27 Watertight bulkheads will provide structural integrity rather than relying on expensive Kevlar reinforcement in the bow.13:33

Watch on YouTube

More from RAN Sailing

There's No Manual For This! Building Our Own 52ft Sailboat - Ep. 506 Ran SailingOct 2026Carbon Pillars & No Dorade Boxes! - Building Our 52ft Sailboat - Ep. 505 Ran SailingOct 2026Will the Sanding EVER End? Building Our Dreamboat - Ep. 503 Ran SailingSept 2026Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502Sept 2026

From RAN Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue