Sailing Umavideo

What Have We Done? | Step 346

28 April 2023 · 15 min · 250K views

What this video covers

Dan and Kika begin a major interior refit on their boat, Uma, after securing a marina berth that permits DIY work.0:10 The project involves stripping the interior to address structural issues, including a damaged bulkhead and a hull dimple caused by an inadequately reinforced knee.11:41 The crew removes the v-berth and the galley nook, discovering that previous repairs were superficial.11:25 To prepare for a six-month storage period during the refit, they pickle the water maker by creating a closed-loop system that circulates a chemical solution through the intake and brine lines.4:44 They protect the galley’s Corian countertop with foam yoga mats during the demolition process.6:38 The crew intends to replace the existing structural grid with a more robust foundation rather than continuing to layer repairs over old work.2:12

Watch on YouTube

More from Sailing Uma

The ONE Thing We Disagreed on This Entire Refit | Step 494Aug 2026We Owe You The Full StoryJul 2026We spent $10,000 on something Pretty | Step 493Jul 2026We Covered Our Boat in Solar. Is It Enough? | Step 492 (Part 3)Jul 2026

From Sailing Uma — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue