Sailing Yabávideo

Prepping our WOODEN BOAT for LAUNCH! Transducer, pumps and through hulls — Sailing Yabá 179

25 January 2024 · 25 min · 70K views

What this video covers

The crew of the wooden boat Yabá installs a new transducer and bilge pump through-hulls while at a shipyard.1:34 Following the manufacturer’s manual, they position the transducer in the forward third of the hull, 15 to 30 centimeters from the keel, to avoid interference from bubbles or ballast.2:19 Because the hull is thick hardwood, they drill a pilot hole and use a jigsaw to enlarge the opening, finishing the edges with a file to ensure a precise fit.8:21 They seal the raw wood edges with epoxy resin before final installation.14:43 Separately, the crew replaces an undersized bilge pump switch with a new, caged automatic switch rated for 16 amps to accommodate high-capacity pumps.11:08 They also drill a new through-hull for a bilge discharge, using a chisel to clear wood when the hole saw depth proves insufficient for the hull thickness.22:05 The crew plans to finalize the through-hull connections and apply antifouling paint after the epoxy cures.14:50

Watch on YouTube

More from Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing YabáOct 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing YabáOct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing YabáSept 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáSept 2026

From Sailing Yabá — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue