Sailing Supernovavideo

A DAY FILLED WITH BOAT JOBS [Ep. 16]

24 November 2023 · 38 min · 18K views · Ensenada

What this video covers

The crew of Supernova performs a series of maintenance tasks while docked in Ensenada, Mexico, to prepare for further cruising.0:03 They replace an anchor shackle with a new anchor swivel and secure the pin with locking wire.0:11 To extend their anchor rode, they splice 150 feet of eight-platt rope to the existing chain.4:27 The crew installs a flag-raising system using a square knot and a trucker’s hitch to tension the line.6:35 They attempt to troubleshoot a malfunctioning wind instrument by installing a new unit and replacing the Garmin GND 10 black box, though the system continues to report inaccurate wind speeds.11:55 Additional projects include welding custom stainless steel fishing rod holders to the stern, mounting an anchor remote near the cabin entrance, and installing a saltwater pump in the starboard hull to supply the galley sink for water conservation.15:58 The crew also explains a previous mast repair involving a metal doubler plate installed at the base to reinforce stress fractures.22:38

Watch on YouTube

More from Sailing Supernova

It was 100% my fault [Ep. 167]Oct 2026So much pain! [Ep. 166]Oct 2026How solo sailors die [Ep. 165]Sept 2026Hurricane prep gone wrong [Ep. 164]Sept 2026

From Sailing Supernova — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue