Sampson Boat Covideo

Tally Ho gets a compass and a winter shed!

16 December 2023 · 16 min · 435K views

What this video covers

The restoration of the 1910 gaff cutter Tally Ho continues with the installation of deck hardware and the construction of a protective winter shed. Crew members installed a flush-mounted steering compass forward of the companionway hatch, a location chosen for visibility from the helm.5:03 Additional bronze hardware from Port Townsend Foundry includes sway hooks for sweating halyards, pin rail supports bolted through the beam shelf, and a gammon iron to support the shippable bowsprit.7:54 A bronze fairlead was also fitted to the transom opening to reduce chafe on mooring or towing lines.10:25 Below deck, the electrical system installation progresses with the assembly of the main panel, which features dedicated AC circuit breakers and a 24-hour 12-volt service circuit for critical alarms and bilge pumps.3:18 To facilitate winter work, the crew erected a shrink-wrap shelter over the deck, supported by the mast and bulwarks.11:49 Proper hardware placement and structural reinforcement are essential for managing the high loads typical of a traditional gaff-rigged vessel.

Watch on YouTube

More from Sampson Boat Co

Sailing through the "Needles"Oct 2026Sailing the British South coast!Sept 2026Tally Ho meets a tidal mud-berth!Sept 2026Tally Ho sails into England after 59 years overseas!Aug 2026

From Sampson Boat Co — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue