Sailing Blue Pearlvideo

Ep 74 | We've arrived! Time to explore Mazatlan

19 May 2024 · 16 min · 2K views · Mazatlan

What this video covers

Chris Hanna installs a 600-amp heavy-duty battery shutoff switch and a shunt for a remote battery monitor on Blue Pearl to manage the house bank.0:43 The refrigeration system suffers a recurring refrigerant leak, requiring a temporary recharge by a local technician in Mazatlan to keep the units operational for visiting family.5:20 An electrician also inspects the boat to address persistent AC overload issues and a failed water pump, which had previously undergone a seal and bearing replacement.13:27 While managing these repairs, the crew coordinates with local followers for transportation and logistics in Mazatlan.5:39 The family visit includes a day sail in 12 knots of wind, achieving 6 knots of boat speed, before returning to the anchorage.10:41 Proper labeling of electrical switches and monitoring systems helps prevent emergency confusion when components are installed in tight, difficult-to-access spaces.

Watch on YouTube

More from Sailing Blue Pearl

Our Precious Daisy Mae💔Jun 2026Ep 100 | The Grand FinaleJun 2025Ep 99 | A great adventure!May 2025Ep 98 | Our big newsMay 2025

From Sailing Blue Pearl — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue