RAN Sailingvideo
Revealing The Inside Of The Hull - Ep. 398 RAN Sailing
14 June 2024 · 18 min · 398K views · Skåne
What this video covers
Johan and Malin are clearing the interior of their boat hull after successfully rotating it. To maintain the structural integrity of the shear line during the removal of temporary plywood frames, Johan installs temporary deck beams at every second frame position.4:19 This process allows the hull to retain its shape while providing a clear view of the interior volume and cabin layout.7:06 The plywood frames, which were protected from epoxy adhesion by tape during the initial build, are being dismantled and salvaged for use as jigs and templates.13:09 Johan marks the waterline and reference points on the hull interior before removing each frame to ensure accurate measurements remain throughout the construction process.13:49 With the bracing and strongback removed, the interior is now an open space, allowing the builders to visualize the final cabin compartments.10:02
More from RAN Sailing
From RAN Sailing — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



