Sailing Good, Bad, and Uglyvideo

THE MOMENT I REALISED I SCREWED UP…

27 July 2025 · 23 min · 110K views

What this video covers

Construction of a 16-foot-tall A-frame structure involves assembling individual frames on the ground and raising them into position using a temporary jig and a reverse-domino erection method. To ensure structural integrity against high winds in a hurricane-prone area, the builder installs 2x4 bracing every two feet, which also serves as a mounting surface for galvanized roof panels. Plywood sheathing (T111) is applied to the frame to provide rigidity, with the builder using 2-inch screws to prevent protrusion through the interior. The process requires careful leveling of the end frames, followed by using a center 2x6 guide to plumb and level the remaining frames. Safety challenges include working at height without fall protection and managing heavy components solo. The builder mitigates potential roof damage from high winds by using specific fastener lengths to ensure secure attachment to the bracing. Proper jig placement at waist height is essential for handling the weight of the frames during assembly.

Watch on YouTube

More from Sailing Good, Bad, and Ugly

IT’S FINALLY DONE!Sept 2026We Needed a Win and This Wasn’t ItAug 2026The End Is Finally NearAug 2026We've Been Avoiding This and We Can't AnymoreAug 2026

From Sailing Good, Bad, and Ugly — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue