Acorn To Arabellavideo
Acorn to Arabella - Journey of a Wooden Boat - Episode 42: Backbone Assembly Prep
24 August 2018 · 18 min · 180K views
What this video covers
The construction of the backbone for the wooden boat Arabella reaches a major milestone as the crew prepares and installs the stem and stern assemblies. To facilitate the build, the team sets up a metalworking station featuring a threader for keel bolts and a custom jig for forging bolt heads.0:17 They sharpen a 16-inch beam saw and a bandsaw using a Foley filer to cut heavy timber components, including the main stern timber and a live oak stern knee.8:27 After fitting the bow assembly to the forefoot and keel timber, the crew cuts a dovetail pocket into the keel to accept the stern post.10:20 Faying surfaces are sealed with wax-free shellac, while joints above the waterline are bedded with Dolphinite.6:11 The team plots bolt locations to avoid interference with future floor timbers before driving the first bronze bolts to lock the keel sections together.16:06
More from Acorn To Arabella
From Acorn To Arabella — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



