Vagabond Voyagesvideo

Refitting the boat: work begins and the first troubles... Ep. 71

11 April 2025 · 24 min · 8K views · Tahiti

What this video covers

Recommissioning a boat after a four-month winter storage period involves extensive maintenance, including rigging, engine systems, and interior restoration. The crew installs the mainsail, genoa, and staysail, noting the importance of proper batten placement and UV-protection strips.4:53 Engine maintenance includes replacing a cracked raw water strainer, which requires adapting 28.5 mm plumbing to 25 mm fittings.13:41 The project also involves servicing marine toilet pumps by replacing internal seals that failed during storage.20:42 Cosmetic work includes sanding and re-varnishing cockpit woodwork and window frames, though the process is complicated by the failure of a power sander, forcing manual labor.8:02 The crew manages these tasks while dealing with physical challenges, including heat exhaustion and minor injuries sustained in tight, inaccessible bilge spaces.17:30 The project highlights the recurring nature of boat maintenance and the logistical difficulties of sourcing parts and tools while living aboard.

Watch on YouTube

More from Vagabond Voyages

Vanuatu: Teak bungs... then the worst seasickness of my life. Vlog 136Aug 2026Sailing Vanuatu: bad weather, life on board and bread recipe. Vlog 135Aug 2026What to bring when visiting the islands of Vanuatu? vlog 133Aug 2026A mission that gives the journey its true meaning. Vlog 134Aug 2026

From Vagabond Voyages — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue