Sailing Triteiavideo

Hauling Out Triteia at Rebak Marina Boatyard to Start The Refit in Malaysia

15 December 2025 · 15 min · 34K views · Rebak Marina, Langkawi

Sailboat Triteia hoisted by crane at Rebak Marina

What this video covers

After 18,000 miles from Los Angeles to Malaysia, James hauls Triteia out at Rebak Marina Boatyard on Rebak Island, Langkawi, for a 30-day mid-circumnavigation refit ahead of an Indian Ocean crossing.0:30 The yard schedules the lift for 09:30, requiring Triteia to back into the slings — a maneuver James flags as awkward.2:05 The engine fails to start on haul-out morning despite running fine two days earlier; crew from SV Africa bring their dinghy alongside to push Triteia into position hip-to-dinghy, the same technique James used in Fiji.6:47 The boat lands in a prime spot near the showers, toilets, and chandlery.11:52 Out of the water, James gets the first clear look at reef-grounding damage.10:09 A small pre-haul task involves replacing a worn carabiner and line-organizer system at the mast gooseneck; the new carabiner is wrapped in Dyneema to prevent mast clang.5:23 The refit series will be structured project by project rather than chronologically, because parts availability and weather dictate a non-linear work sequence.14:23

Watch on YouTube

Boats in this video

Alberg 30Their boat

More from Sailing Triteia

Dangerous Sailing in Coral Passes & Storms in the Maldives on a 30ft SailboatAug 2026Pushing Through The Maldives - Cruising in Paradise At the Wrong Time of YearAug 2026Visiting a Tea Plantation and a Buddhist Temple with Paul from Galle in Sri LankaJul 2026Sri Lanka Adventures! Seeing Crocodiles, Sloth Bear, Elephants, Leopards and More on SafariJul 2026

From Sailing Triteia — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue