Sailing Zephyrvideo
Our Scariest Moment at Sea - 800nm from Land - Ep. 78
22 April 2021 · 22 min · 19K views · Atlantic Ocean
What this video covers
During a 22-day Atlantic crossing from Gran Canaria to Antigua, the crew of the 45-ft sailboat Zephyr encountered two critical equipment failures in heavy, gusty conditions.0:30 On the fifth day, a 23-25 knot gust caused the whisker pole attachment on the mast to shear, nearly losing the pole overboard.7:00 The crew retrieved the pole and repaired the end fitting by drilling new holes, though the modification limited the pole's extension and reduced the genoa's downwind sail area.8:02 Shortly after, a routine engine check revealed a sheared bolt on the alternator bracket, which had caused the alternator to vibrate loose and severed a coolant line.8:45 The crew replaced the bolt and resecured the alternator, preventing a total engine failure.11:17 Throughout the passage, the crew managed seasickness, maintained a rotating watch schedule, and conducted a 15-minute plastic collection tow for the Seakeepers organization.17:35 The vessel completed the 3,000-mile transit in 22 days.21:34 Regular engine and rig inspections are essential to identify vibration-induced failures before they become catastrophic.
More from Sailing Zephyr
From Sailing Zephyr — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



