Wildly Intrepid Sailingvideo

A typical day in the WORK YARD in Green Cove Springs [E349]

21 September 2025 · 17 min · 1K views · Green Cove Springs

What this video covers

The crew of a liveaboard family boat performs extensive hull repairs while hauled out at Green Cove Springs Marina. Work focuses on addressing gelcoat cracks and structural voids, particularly around the bow and through-hull fittings.3:08 After grinding into the fibreglass to reach sound material, the crew reinforces damaged areas with multiple layers of 1708 fibreglass cloth and epoxy resin.6:11 Investigation into the bow cracking revealed failing tabbing at the anchor locker bulkhead, necessitating additional structural repairs.3:20 The project also involves fairing through-hull locations with solid glass to replace old, failed filler and planning to raise the waterline due to the vessel sitting lower than expected.7:54 Alongside boat maintenance, the family maintains a daily routine of homeschooling and childcare for their two young children while living on the hard.8:33 The crew uses Total Boat epoxy filler for shallow imperfections and prioritises structural integrity over cosmetic filler to ensure long-term durability.2:58

Watch on YouTube

More from Wildly Intrepid Sailing

Shipwrecks, Volcano Ruins & a HUGE Family Surprise! | Martinique E401Oct 2026Our Time in Dominica Ends BADLY… Then the Sail Gets Worse! E400Sept 2026WORTH NO SLEEP? Dominica's hidden gem E399Sept 2026We Got LOST in the Pirates of the Caribbean Indian River! E398Sept 2026

From Wildly Intrepid Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue