Changing All Our Rigging A Week Before We Cross the Pacific!! - (Episode 221)
13 August 2023 · 36 min · 205K views · Puerto Vallarta
What this video covers
The crew of the Lagoon 450 *Parlay Revival* replaces their entire standing rigging in Mexico shortly before a 3,000-mile Pacific crossing to French Polynesia.0:13 After struggling to find local expertise, the team recruits Jonas Berg, an owner of Selden Mast, to lead a rigging masterclass.0:19 The project involves removing seized stem ball fittings from the mast, which the crew clears using vinegar and patience rather than drilling.7:52 They inspect all new hardware, including wires and fittings, and install Stay-Lok mechanical fittings on the diamond shrouds.3:53 To reinforce the tangs, the crew installs custom stainless steel plates to prevent sideways movement and potential failure.24:06 During assembly, they emphasize cleaning the furler foils to remove debris that could cut the forestay, a common cause of rig failure.20:46 The team uses rigging oil on turnbuckles to ensure proper tensioning and avoids using silicone or polyurethane sealants on fittings to prevent stainless steel corrosion.30:10 Professional guidance and meticulous attention to detail during the rigging process significantly reduce the risk of catastrophic mast failure at sea.
Boats in this video
More from Sailing Parlay Revival
From Sailing Parlay Revival — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



