Sailing SV Delosvideo

Deadlines and SETBACKS…Building An Aluminum Catamaran Part 5

13 September 2024 · 21 min · 249K views

What this video covers

Construction of an aluminum expeditionary catamaran reaches a critical phase 10 weeks into the build, with the team preparing to flip the hull.0:06 The vessel is being built upside down to simplify welding and plate assembly.0:24 During the process, the team encountered a 5mm gap between hull plates where a 1mm gap was intended, a result of material thickness increasing from 5mm to 6mm and subsequent plate shrinkage during the wheeling process.5:36 To bridge the gap, the team uses TIG welding for its heat control, while MIG welding is used for the interior seams.6:34 The project lead suffered a back injury, likely a slipped disc, which temporarily halted his participation in the shop work.10:37 During his recovery, the team shifted focus to interior design, specifically optimizing the galley layout for storage and weight efficiency.12:22 The design process involves drafting layouts to replace the deep storage and bottomless bilges found on their previous boat, with plans to convert these designs into CAD files for fabrication.17:15

Watch on YouTube

More from Sailing SV Delos

OUR MAST: The INCREDIBLE Process! (EXTENDED CUT) Building Our Own Aluminum Catamaran Pt. 87Sept 2026You Need to See This 🤯 Building Our Own Aluminum Catamaran Pt. 86Sept 2026Fit or FAIL 🫣 Building Our Own Aluminum Catamaran Pt. 85Sept 2026This Is Where It Gets INTERESTING…Aluminum Catamaran Build Pt. 84Aug 2026

From Sailing SV Delos — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue