RAN Sailingvideo
15 m long strips aren't easy to handle - Ep. 345 RAN Sailing
28 April 2023 · 16 min · 124K views · Skåne
What this video covers
Johan and Malin are constructing a 50-foot sandwich-core hull inside a barn, utilising cedar strips reinforced with thick fibreglass on both sides.3:41 Because the fibreglass provides the structural load-bearing capacity, the hull does not require traditional wooden boat-building joinery.3:37 Johan uses a 1-to-4 scarf joint for the cedar strips, employing a custom plywood jig to ensure accurate, repeatable cuts.5:56 To prevent the strips from slipping during the epoxy curing process, he uses a stapler to secure the joints, which allows for the use of smaller, lighter spring clamps.8:32 The team aims to produce and mount six to nine 15.5-metre-long strips daily to complete the hull before autumn temperatures limit epoxy work.10:26 Johan uses rollers and magnetic fence guides to rip cedar planks into strips efficiently, targeting a daily output of 250 metres of material.14:35 Pre-gluing strips into full lengths before mounting them to the hull significantly increases the speed of the planking process.9:35
More from RAN Sailing
From RAN Sailing — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



