Another Adventurevideo

Installing Starlink & Diesel Heat on Our Sailboat + Carbon Fiber Vacuum Bagging (w/ Ducks!)

15 April 2025 · 14 min · 4K views

What this video covers

The crew installs a Starlink antenna on the radar arch and a diesel heater in the main cabin of their sailboat.2:50 To route the Starlink cable, they feed the wire through the hull and cockpit compartments.1:17 They also perform a structural modification to the interior by removing a redundant centerboard housing to create space for a new head.7:34 To reinforce the area where a new hatch will be installed, they apply carbon fiber layers using a vacuum bagging technique.8:30 This process involves layering peel ply, flow cloth, and breather material over the carbon fiber before sealing the assembly with a vacuum bag and pump.11:10 The vacuum maintains a pressure of approximately 20 inches of mercury to ensure consistent resin distribution and structural stiffness.10:25 The project successfully converts a dark storage area into a functional wet head.13:57

Watch on YouTube

More from Another Adventure

literally BULLETPROOF nav lights at ShowMeYourDinghy comAug 2026Tritium Panama Canal CrossingApr 2026Show Me Your Dinghy! The MOST waterproof and affordable Dinghy Navigation light available!Jul 2025HOW TO Install Underwater Thru Hulls IN The WaterMay 2025

From Another Adventure — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue