More
Language
Display mode
Sailing Yabávideo
29 March 2026 · 28 min · 103K views
Crew installs rudder pintle on 88ft wooden boat YABAI
What this video covers
Shipyard upgrades on an 88-ft wooden boat, Yaba, focus on structural steering improvements to facilitate a future autopilot installation.▶ 0:00 Shipwrights reinforce the rudder assembly by fitting a new, heavy-duty wooden section to the rudder post, utilizing epoxy and threaded bars to secure the pintle and gudgeon.▶ 14:23 To resolve anchor chain piling issues that block the windlass, the crew deepens the anchor chain locker by 20 centimeters and adds a V-shaped slope to the floor.▶ 18:37 Additional maintenance includes replacing ash spreaders, varnishing exterior woodwork, and servicing the propeller, shaft, and gearbox.▶ 9:48 The team also fabricates a new quadrant and custom stainless steel rings for halyard attachment.▶ 22:59 Caulking seams are smoothed, and interior furniture is added to the library and toolbox areas.▶ 23:24 A temporary red LED light in the pilothouse is permanently wired and boxed for a cleaner finish.▶ 20:23
More from Sailing Yabá
From Sailing Yabá — see the channel’s boat, crew, and every analysed video.