Sailing SV Delosvideo
New Challenge UNLOCKED! Aluminum Catamaran Build Part 4
6 September 2024 · 25 min · 283K views · Australia
What this video covers
Fitting aluminum hull plates to the SV Delos catamaran requires a multi-step process of cleaning, sanding, and shaping using an English wheel or external pressing shop.1:05 Because CNC-cut plates rarely fit perfectly, the crew uses temporary welded tabs, chain blocks, and "dog and wedge" setups to force the aluminum into position before tack welding.2:36 Aligning seams requires maintaining a precise gap, often adjusted with temporarily welded pry bars.3:38 The team encountered a significant error when a large plate for the galley and seating area was marked backwards during the CNC process, requiring a creative workaround to avoid replacing the expensive material.12:31 The build schedule is currently driven by a five-week deadline to flip the hull for welding the opposite side.14:07 The crew also manages interior design research, including insulation and material selection, while balancing the physical demands of the project.19:27 Proper tack welding techniques, such as spacing tacks to avoid divots at the end of weld runs, are essential for achieving a smooth, finished hull surface.21:25
More from Sailing SV Delos
From Sailing SV Delos — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



