RAN Sailingvideo

Milestone Reached: Full Deck In Place, Cockpit Next! - Ep. 457 RAN Sailing

12 September 2025 · 19 min · 97K views · Skåne

What this video covers

Construction of a custom boat in Skåne, Sweden, reaches a milestone as the full deck structure is installed, spanning 15.2 meters from the aft to the bow.12:03 The build process involves laminating PET foam panels with fiberglass, using 30 layers for structural G10 components like aft cleats and lifeline stanchions.1:53 To prevent overheating during the curing process, water-filled bags are placed on the laminated surfaces.2:46 The team is currently finalizing the cockpit layout, which features a split-level design to accommodate headroom beneath the deckhouse roof, with 2.1-meter-long benches.12:43 Future work includes designing a watertight engine room hatch, installing a solar arch, and finalizing the dinghy davit system.15:07 The project, now entering its third year, is shifting focus toward sealing the structure for the upcoming winter season to allow for interior heating during continued construction.17:54

Watch on YouTube

More from RAN Sailing

Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502Sept 2026This Is Where Boat Builds Break People - Ep. 501 Ran SailingAug 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran SailingAug 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran SailingAug 2026

From RAN Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue