RAN Sailingvideo

First Cabin Space Complete! - Ep. 426 RAN Sailing

24 January 2025 · 27 min · 147K views · Skåne

What this video covers

Johan and Malin continue the interior construction of their 50-foot boat by laminating and installing structural bulkheads for the forward cabin.0:59 To minimize waste and cost, they laminate large, non-rectangular bulkheads as single pieces using PET foam, fiberglass, and epoxy, rather than joining smaller panels.2:42 They use a handheld CNC router to cut the foam based on digital design files.5:59 During the vacuum-bagging process, they use a 600-gram and 300-gram fiberglass weave on both sides of the foam.10:42 Johan notes that cutting door openings before lamination caused the vacuum pressure to shift the foam and wrinkle the top fiberglass layer, a lesson he intends to apply to the remaining four bulkheads.19:29 The team temporarily glues the bulkheads into the hull to verify spatial layout before final tabbing.16:04 They adjust for hull thickness variations caused by chainplate reinforcement and floor tabbing by trimming the bulkhead edges to achieve a proper fit.17:34 The forward cabin layout now includes space for closets, a bed, and storage for a bow thruster.23:03

Watch on YouTube

More from RAN Sailing

Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502Sept 2026This Is Where Boat Builds Break People - Ep. 501 Ran SailingAug 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran SailingAug 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran SailingAug 2026

From RAN Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue