EMERGENCY HAULOUT 24 hours before leaving New Zealand! - (episode 275)
25 August 2024 · 19 min · 199K views
What this video covers
The crew of the Lagoon 450 *Parlay Revival* performs an emergency haulout in Whangārei, New Zealand, to rebuild two Yanmar SD60 sail drives 24 hours before their scheduled departure for Fiji.1:44 After experiencing persistent cone clutch slippage and oil leaks with their previous SD50 units, the crew sources used clutch assemblies to construct two functional SD60 drives.4:33 During the installation, the team discovers a missing input shaft seal, requiring them to unbolt and separate the sail drive from the engine to correct the error.6:26 Following a successful sea trial in 20 knots of wind, the crew uses load sensors to measure shroud tension, recording two tons of force on the windward shroud while sailing close-hauled.14:19 They conclude the maintenance period by fine-tuning the rig tension and clearing customs at Marsden Point Marina.14:50 The vessel departs for Fiji with a full crew, marking the end of their New Zealand circumnavigation.18:12 Rebuilding sail drives requires meticulous attention to seal placement and internal component assembly to prevent critical oil leaks.
Boats in this video
More from Sailing Parlay Revival
From Sailing Parlay Revival — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



