Sarakawavideo

Objectif Grèce, Check ! #005

26 December 2024 · 32 min · 2K views · Greek Islands

What this video covers

The vessel navigates south from Corfu, encountering Beaufort 5 to 6 winds and 1.2-meter seas.9:42 To manage the conditions, the crew reefs the mainsail twice and the genoa three times, maintaining a speed of 6.6 knots at 55 degrees to the wind.9:50 The route avoids the Corinth Canal in favor of circumnavigating the Peloponnese.10:56 During the transit, the boat encounters 28 knots of wind, necessitating careful sail management to avoid damaging the genoa.8:53 The passage includes sailing through a submarine exercise zone near the Peloponnese coast.21:05 Upon reaching the area near Chalkis, the crew installs a new mainsail.29:27 The transit concludes with a passage under the bridge at Chalkis, where the mast clearance is approximately 15 to 17 meters against a 35-meter bridge height.28:40 The crew notes that the water temperature is dropping as November progresses.24:09

Watch on YouTube

Boats in this video

Jeanneau Sun Odyssey 39iTheir boat

More from Sarakawa

Greece, The Cyclades Part 2 #012Jul 2026Greece, The Cyclades Part 1 #011Jun 2026Greece, Crete, Force 7 close-hauled #010Oct 2025Greece, Dodecanese #009Sept 2025

From Sarakawa — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue