RAN Sailingvideo
This Method Will Be A Real Game Changer! Building Our 50ft Sailboat - Ep. 373 RAN Sailing
1 December 2023 · 21 min · 96K views · Skåne
What this video covers
To improve efficiency while laminating a 50-foot hull, the crew constructs a heated saturation table to pre-wet 600-gram fibreglass cloth before application.1:02 The table features integrated floor-heating cables controlled by a thermostat, allowing the team to saturate the fabric in a standing position rather than crawling on the hull.1:48 This method reduces the time required to apply a single piece of fibreglass from over two hours to one hour and ten minutes, significantly decreasing physical fatigue.17:14 The crew uses a router to embed heating cables into styrofoam, maintaining a table temperature of approximately 25 degrees Celsius.8:53 Despite heavy snowfall in southern Sweden that complicates travel and limits work hours, the team successfully tests the process on the hull.16:32 The new technique allows for easier air bubble removal and better saturation control compared to applying dry cloth directly to the hull.16:09 Pre-saturating fibreglass on a heated table reduces labour time and physical strain during large-scale hull lamination.
More from RAN Sailing
From RAN Sailing — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



