kentblairlvideo

Drascombe Lugger Dry Run aka Yard Sailing

31 May 2024 · 9 min · 377 views

What this video covers

Kent Blair performs a yard-rigging drill on a 1980 Drascombe Lugger named Anki to verify gear readiness before launching.Watch The boat features a gaff-rigged main, a roller-furling jib, and a mizzen sail mounted on a bumpkin.0:28 To accommodate a 6-horsepower Suzuki outboard, Blair installs a sacrificial pad and a series of shims—three-eighths of an inch at the top and one-quarter of an inch at the bottom—to ensure the motor clears the transom cutout when tilted.4:33 The setup requires the tiller to remain slightly elevated when the motor is in the down position to avoid contact with the fiberglass.5:19 The boat carries a manual bilge pump that discharges into the centerboard trunk, a throwable flotation device, and a ditch kit currently being updated to include a rescue flare.3:25 Blair uses a custom wooden chock to hold the rudder blade in a partially raised position during launch, allowing for full deployment once the boat clears the trailer.7:40 The rigging process takes approximately 20 to 25 minutes.9:13

Watch on YouTube

Boats in this video

Drascombe LUGGERTheir boat

More from kentblairl

Bahamas Dinghy HENNING Tape RemovalSept 2026Nutshell Pram Tiller Repair IIJun 2026Nutshell Pram Tiller RepairJun 2026Bottle Jack ServicingMay 2026

From kentblairl — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue