WEsailvideo
WE are in Two VERY Different Places! | Episode 306
26 July 2025 · 24 min · 20K views · New Zealand
What this video covers
Warren completes several major fibreglass and carbon fibre fabrication projects at a boatyard in New Zealand while Erica recovers from leg surgery. The primary tasks involve constructing custom lids and boxes for a built-in freezer and a barbecue station, utilising moulds, gel coat, and epoxy.0:14 To fabricate new dash panels for the nav and helm stations, Warren uses a carbon fibre layup technique that involves wetting the weave on plastic sheets to maintain alignment before applying epoxy and wood reinforcement.3:05 After curing, he removes the pieces from their forms, performs light sanding, and prepares the surfaces for final polishing.13:30 The freezer lid features a tight, sub-millimetre fit and two inches of insulation, supplemented by an additional four inches of cushion padding.22:04 Meanwhile, Erica receives medical clearance to transition from a cast to a walking boot and begins physical therapy.15:06 The projects remain in the final finishing stages, requiring additional wet sanding and polishing to remove minor surface bubbles and imperfections.13:51
More from WEsail
From WEsail — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



