More
Language
Display mode
Sam Holmes Sailingvideo
17 January 2026 · 14 min · 38K views
Marine AC unit installed on sailboat deck with ducting
What this video covers
Sam Holmes and Arlene perform multiple refit projects on their boat, including installing a new marine air conditioning unit and preparing for a new sail. To install the air conditioner, Sam drills through-hull water intake holes, excavates the core material, and seals the edges with epoxy to prevent water ingress.▶ 4:15 He fabricates custom fibreglass air ducts using a homemade mould and circle-cutting jig, noting that bending fibreglass along the bias allows for easier shaping.▶ 11:36 The electrical system for the unit is finalised with custom cables from a local shop, and the system successfully pumps water upon testing.▶ 8:47 Concurrently, the crew removes an old sail for measurement and replacement, opting for a laminate sail with Sunbrella sacrificial protection.▶ 0:19 Arlene manages electrical repairs, including wiring the anchor, tri-colour, and steaming lights, while also labelling circuits and replacing LED fixtures.▶ 5:47 Sam also replaces the dinghy fuel hose and priming bulb, and announces the future replacement of their current RIB with a 3.3-metre carbon fibre dinghy from Excelsior.▶ 2:29
More from Sam Holmes Sailing
From Sam Holmes Sailing — see the channel’s boat, crew, and every analysed video.