BEST place for Unstepping our mast for the Erie Canal [E279]
2 February 2024 · 14 min · 2K views · Erie Canal, New York
What this video covers
Alex and Cory prepare their boat for the Erie Canal transit by unstepping the mast to meet the October 11th canal closure deadline.1:08 The process involves removing the boom and securing all rigging pins to prevent loss during the transition to a powerboat configuration.5:14 During the unstepping, the crew manages approximately 800 pounds of pressure on the mast base, using a wedge to free the mast from its step.5:40 Following the demasting, the crew shifts focus to electrical and solar upgrades.10:41 Alex works with a friend named Dave to replace a temporary wooden solar panel mount with a permanent, hinged rail system designed for better shading and long-term functionality.10:56 The project aims to improve the current solar setup while transitioning the vessel for inland waterway navigation.11:00
More from Wildly Intrepid Sailing
From Wildly Intrepid Sailing — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



