Sailing Learning By Doingvideo

Broken Trampolines will kill us if I can't fix the problem. Ep254

15 March 2024 · 16 min · 3K views · Lombok

What this video covers

The owner of the catamaran Learning By Doing repairs cracked and broken aluminum welds on the trampoline support gantry while anchored in Lembar, Lombok, Indonesia.0:39 The trampoline system uses a bolt rope track that had failed, causing the netting to flex and pull away from the frame.0:39 After removing the Dyneema lashings and the fiberglass deck cover, the owner transported the aluminum gantry to a local boatyard in the Lembar river to have the tracks re-welded.9:05 The repair process involved grinding down old welds and straightening the track, though the thin aluminum material proved difficult to weld without burning through.9:54 Reinstalling the assembly required two-person teamwork to align the bolt ropes and secure the through-bolts.11:19 The owner concludes that the bolt rope design is overly complicated and prone to failure compared to a standard four-sided lashing system, noting that he intends to replace the current setup with simple lashings if the welds fail again.15:10

Watch on YouTube

More from Sailing Learning By Doing

How to CHEAPLY transport a 10m Catamaran. (Ep 318)May 2026New Kids On The Dock and their huge new Cat.(Ep 317)Apr 2026Cyclone Narelle, what actually happened?(Ep 316)Mar 2026Cyclone Narelle, live update from our sailboat. (Ep 315)Mar 2026

From Sailing Learning By Doing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue