Sailing Squibvideo

Back in Vienna

16 October 2025 · 12 min · 991 views · Vienna

What this video covers

The crew of the vessel Squib concludes a long-distance delivery voyage from the Danube to Mesolonghi, Greece, reflecting on the mechanical challenges and the psychological toll of the transit. Throughout the journey, the crew faced frequent equipment failures, including a significant water pump issue on the starboard engine while on the Danube.2:43 The host emphasizes the importance of systematic troubleshooting for diesel engines, noting that most failures stem from peripheral components like impellers, fuel lines, or filters rather than internal engine damage. Upon arrival in Mesolonghi, the starboard engine failed to start during docking, causing a minor collision with a neighboring boat.1:56 Despite these setbacks, the crew successfully completed the passage by breaking the route into manageable, incremental stages.6:19 The experience highlights the necessity of maintaining a positive outlook during technical crises to ensure crew morale. Future plans involve shorter daily passages and a shift in focus toward leisure rather than demanding delivery schedules.10:34

Watch on YouTube

More from Sailing Squib

Sailing Squib - May 2026/3Sept 2026Sailing Squib May 2026 /2Aug 2026Sailing Squib - Contemporary WitnessJul 2026Sailing Squib - May 2026 /1Jul 2026

From Sailing Squib — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue